BATH AND NORTH EAST SOMERSET COUNCIL

 

(THTTC3560 VARIOUS FOOTPATHS, BATH)

(TEMPORARY PROHIBITION OF USE BY PEDESTRIANS) ORDER 2024

 

Notice is given that Bath and North East Somerset Council in exercise of its powers under section 14 of the Road Traffic Regulation Act 1984 intends to make an order the effect of which will be to temporarily introduce various footpath closures between the dates and times specified in Schedule 1 of this notice.

 

This order is required because works are being or are proposed to be executed on or near the road to enable contractors to carry out trackwork to extend VM02 network including tobies and chambers from the 5th August 2024 for a maximum period of 6 months. The footpaths will only be restricted as and when traffic signs are in position and may not be effected for the whole of the period but only for so long as is necessary to execute the works. This is anticipated to be for TEN DAYS at each location.

 

ALTERNATIVE ROUTE: Diversion to be clearly signed at each closure.

 

Link to One.network: See Schedule 1illH

 

 

Applicant Details: Lauren Ebdon

Telephone: Phil Trueman – 07712 273203

Email: lauren@marjen.co.uk

 

 

 

Dated: 18th July 2024

 

Traffic Management Team
Lewis House
Manvers Street,
Bath
BA1 1JG

 

 

 

 

 

Chris Major

Director of Place Management



 

 

 

 

 

 

 

 

 

 

 

 

 

Schedule 1 - FOOTPATH CLOSURES, between dates and times stated

 

Name of Footpath

Closure Extents

Dates

Footpath between Uphill Drive and Coxley Drive, Bath

From outside 35 Uphill Drive extending east to outside 1 Uphill Drive

From 5th August until 12th August 2024

 

https://one.network/?tm=139303739

Footpaths Rose Hill, Bath

From outside 56 Rose Hill extending north east to outside 32 Rose Hill and from outside 31 Rose Hill extending south to outside 15 Rose Hill.

From 6th August until 15th August 2024

 

https://one.network/?tm=139303753

Footpaths Lambridge Street, Bath

From outside 11 Lambridge Street extending north west to outside 20 Lambridge Street. To also include the diagonal path across the green to outside 24 Lambridge Street

From 8th August until 15th August 2024

 

https://one.network/?tm=139303760

 