BATH AND NORTH EAST SOMERSET COUNCIL |
||
(THTTC3066 FARMBOROUGH LANE, PRISTON BATH) (TEMPORARY PROHIBITION OF USE BY VEHICLES) ORDER 2023 |
||
Notice is given that Bath and North East Somerset Council in exercise of its powers under section 14 of the Road Traffic Regulation Act 1984 intends to make an order to the effect of which will be to temporarily introduce a road closure in that length of Farmborough Lane, Priston, Bath, from its point outside 36 Farmborough Lane extending south west to its point outside the property known as Holt House. USRN: 47920413. |
||
This order is required because works are being or are proposed to be executed on or near the road to install a new connection by National Grid on the 14th February 2023 for a maximum period of 6 days. The road will only be restricted as and when traffic signs are in position and may not be effected for the whole of the period but only for so long as is necessary to execute the works. This is anticipated to be for FOUR DAYS. ALTERNATIVE ROUTE: Marksbury Lane – Priston Lane – Mollifiend Lane – A39 Bath Road – Timsbury Road – Priston Lane – Farmborough Lane – Vice Versa Link to One.network: https://one.network/?tm=132243964
Applicant Details: Hannah Charles Telephone: National Grid – 01761 405131 Email: hcharles@nationalgrid.co.uk |
||
|
||
|
Dated: 26th January 2023 Traffic Management Team |
Chris Major Director of Place Management
|